§Registered USAspending FY2027 DoD Prime Award Obligations
The target is the registered USAspending API v2 query for agency 097, field obligations, transformed by 1e-9 into billions USD. The ledger commits resolutionDate 2027-10-22, matching the end of the expected release window 2027-10-15 to 2027-10-22. The slug was checked against app.thesisinstitute.org/specs.json in this run and no duplicate published slug was returned by the local match command.
GET registered sourceBinding URL for FY2016-FY2020↳ USAspending agency 097 awards obligations fetched this run: FY2016 obligations=304733246938.93, FY2017 obligations=327990949917.96, FY2018 obligations=365937501255.11, FY2019 obligations=391333992872.89, FY2020 obligations=431883672152.30; transformed by 1e-9 gives 304.733, 327.991, 365.938, 391.334, 431.884 billions USD.GET registered sourceBinding URL for FY2021-FY2025↳ USAspending agency 097 awards obligations fetched this run: FY2021 obligations=395332709399.53, FY2022 obligations=424512414112.80, FY2023 obligations=467273435599.16, FY2024 obligations=456945504400.91, FY2025 obligations=501543513238.03; transformed by 1e-9 gives 395.333, 424.512, 467.273, 456.946, 501.544 billions USD.GET registered sourceBinding URL for FY2026 and FY2027 resolver-state check↳ USAspending agency 097 awards query fetched this run returned FY2026 obligations=298980123138.95, transformed to 298.980 billions USD, but FY2026 is incomplete on 2026-08-13. FY2027 query returned error detail: Field fiscal_year value 2027 is above max 2026.Base rate / reference class: completed FY2016-FY2025 registered-query obligations have mean 406.7B, range 304.7B to 501.5B, and last completed print 501.5B. Successive completed annual changes are +23.3B, +37.9B, +25.4B, +40.5B, -36.6B, +29.2B, +42.8B, -10.3B, and +44.6B, with mean +21.9B, sigma 27.6B, and range -36.6B to +44.6B. Last-print persistence benchmark for FY2027 is 501.5B; the mean-change trend benchmark is 501.5 + 2*21.9 = 545.3B because FY2026 is not yet a completed print.
Model candidates under thesis_model_candidate_v1, train cutoff FY2025 completed registered query: persistence candidate point=501.5B, p10=451.6B, p50=501.5B, p90=551.4B, 80% interval 451.6B-551.4B, 90% interval 431.0B-572.0B, interval_method=annual-change residual sigma over FY2016-FY2025, calibration_n=9, one-step walk-forward MAE=33.4B. Mean-change trend candidate point=545.3B, p10=495.4B, p50=545.3B, p90=595.2B, 80% interval 495.4B-595.2B, 90% interval 463.1B-627.5B, interval_method=two-year annual-change residual sigma sqrt-horizon, calibration_n=9, one-step walk-forward MAE=24.1B. The trend candidate beats persistence in backtest and is selected.
Prior/update/interval: prior = mean-change trend candidate from completed FY2016-FY2025 registered-query history; historical sample = 10 completed values and 9 annual changes. Adjustment components: +0.0B for current FY2026 partial print because it is not a comparable completed fiscal-year snapshot; +0.0B for the NDAA mechanism because the forecast is conditional on enactment by 2026-12-31 and no separate numeric appropriation-to-prime-award conversion fetched this run clears the update test. Point = FY2025 501.5B + 2*(mean annual change 21.9B) = 545.3B. Interval method = annual-change residual, two-year horizon. sigma = 27.6B from successive completed annual changes; basic half-width = 1.28*sigma = 35.3B; widen by sqrt(2)=1.41 for two fiscal years beyond the last completed print, half-width = 1.28*27.6*1.41 = 49.9B. Implied 80% bounds = 545.3 - 49.9 = 495.4B and 545.3 + 49.9 = 595.2B.
Counter-consideration: downside risk outside the interval would come from a prolonged FY2027 continuing resolution, appropriations timing lag despite NDAA enactment, procurement execution delay, or cancellation-driven award slowdown, which would land below 495.4B. Upside risk outside the interval would come from unusually large shipbuilding, aircraft, munitions, or Ukraine/Indo-Pacific supplemental obligations posting into prime awards before the snapshot, which would land above 595.2B.
Review disposition: accepted the resolver clarification by distinguishing the first successful registered-query snapshot from the fixed 2027-10-22 ledger deadline, and accepted the historical-context completeness fix by carrying the full FY2016-FY2025 registered-query history. Kept the sigma, sqrt(2) horizon widening, and interval bounds unchanged.